TEWIN PARISH COUNCIL
Minutes of the Annual Parish Council meeting held on Monday 1st September 2003 in Tewin Memorial Hall at 7.45pm.
Present: Cllrs
K.Lawson, K.St Pier, S.Glew, M.Howe, S.Stott and C.Pool.
In attendance:
Mrs C.McFarlane (Clerk) and 1 member of the public
43. NO APOLOGIES FOR ABSENCE WERE RECEIVED
44. MINUTES OF THE PREVIOUS MEETING held 7th
July 2003 were agreed and signed by the Chairman.
45. MATTERS ARISING FROM THE MINUTES:
Tewin Charities The notice detailing the proposal from the trustees of this charity to close has been put up on the Notice Board.
Common Land The Our Common Land Book has not been received yet.
46. FINANCE
Accounts for Payment In accordance with the Councils Financial Regulations the schedule of payments amounting to £1531.20 were approved.
Budget A copy of a report detailing Tewin Parish Council expenditure to date versus the budget was distributed. Expenditure is proceeding to plan and there has been no expenditure in excess of budget.
Further analysis of the budget should be put on the agenda for the 1st December meeting.
Clerks Salary Cllr S.Stott proposed and Cllr M.Howe seconded that the proposed pay increase be awarded to the Clerk. The Parish Council unanimously agreed.
47. PLANNING
TPC Received:
3/03/1288/FP/3LAH 27 Firs Walk, Tewin Wood 2 storey front extension & 1st floor side extension & extended driveway TPC No obj
3/03/1321/FP/3EH 54 Orchard Road. Tewin Wood Front Extension to form double garage TPC No Obj
3/03/1320/FP/3EH 54 Orchard Road, Tewin Wood Detached Double Garage TPC Obj
EHDC Decisions:
3/03/0667/FP 6 Desborough Drive, Tewin Single Storey Front Extension TPC No Obj- EHDC Granted
3/03/1045/FP 4 Desborough Drive, Tewin Single Storey Rear Extension TPC No Obj- EHDC Granted
3/03/1094/FP Hickory Hollow, 38 Firs Walk, Tewin Wood Alterations & Extensions TPC No Obj EHDC Refused
3/03/1048/FP 31 Orchard Road, Tewin Wood Proposed 2 Storey side extensions, 2 storey rear extension & attached garage TPC No Obj EHDC Granted
3/02/2598/FP 36 Firs Walk, Tewin Replacement of Existing Dwelling TPC No Obj EHDC Granted
3/03/0301/FP Warrengate Farm, Tewin Gated vehicular
access to field (part retrospective) TPC Obj EHDC Refused
3/03/0738/FP - 16 The Walled Garden, Tewin Rear Conservatory TPC Obj
EHDC Granted
3/03/0782/FP 25 Upper Green Road, Tewin Single storey side and part rear extension TPC No Obj EHDC Granted
3/03/0930/FP Land West of Back Lane, Tewin Increased pitch and plain clay tiled roof in lieu of corrugated fibre based roofing sheets to approved barn. - TPC No Obj EHDC Granted
3/03/0824/FP 43 Orchard Road, Tewin Wood Additional Crossover with new entrance gates TPC Obj EHDC Refused
3/03/0820/LB Queen Hoo Hall, Tewin Proposed Barn Alterations TPC No Obj EHDC Granted
3/03/1177/FP/3SD Marden Hill, Hertford Conversion of Basement Area to Provide 2 3 bed flats - TPC No Obj EHDC Granted
3/03/1178/FP/3SD Marden Hill, Hertford Conversion of Basement Area to Provide 2 3 bed flats (Listed Building Consent) - TPC No Obj EHDC Granted
3/03/1165/FP/3LAH 10 East Riding, Tewin Single Storey Rear Conservatory - TPC No Obj EHDC Granted
Appeal Decision
3/02/1839/FP 13 Godfries Close, Tewin Loft Conversion and rear dormer TPC Obj, EHDC Refused Appeal Dismissed.
Enforcement Issues
Excessive Signage at Rose & Crown : The Enforcement section have
written to the manager and to Greene King requesting a meeting.
Caravan sited at Plume of Feathers : The
manager and Greene King have been advised that planning permission is necessary.
Barn at Sevenacres Prior approval has been
requested.
Community Planning Initiatives :- Cllr Mike Howe volunteered to attend a Parish Information meeting on the 14th October and report back.
Quality Parish Councils The Parish Council unanimously agreed that we do not qualify (e.g. less than 80% of the full Council has been elected). There would also be no obvious benefits to the parish and its parishioners at the present time.
48. HIGHWAYS & TRANSPORTATION ISSUES
The Clerk was asked to ascertain when the School Lane drainage works are expected to start, when the cameras are going to be put down the drains, ownership of the hedges from 14~44 Upper Green Road and when the Village Shop sign would be put up.
Home & School Transport Policy The Parish Council agreed to respond to Wattonat-Stone Parish Council reporting that to date they have had no feedback from Parishioners on this issue.
49. PAVILION & UPPER GREEN
Tennis Club Proposal The Council agreed that a separate meeting with the Tennis Club be arranged.
Cricket Club The Clerk was asked to raise the following issues with the Cricket Club: naming a liaison officer, making the main doors weatherproof, clearing the debris behind the Pavilion.
50. CORRESPONDENCE Received in July and August
2003
Community Liaison Officer PC Ivans The Clerk was asked to contact him re motorcycles riding on the parish paths.
51. RISK MANAGEMENT Following Meeting on 6.5.03
Works Done: The Clerk is in the process of arranging the repair of the pavilion window.
52. PARISH PATHS PARTNERSHIP
Cllr K.St Pier has completed the PPP report and the grant application for this year although the grant has not yet been received.
Diversion of FP26 - Paula Cheesman, EHDC has suggested that FP26 be diverted from in the field to along the edge, if the Parish Council can justify that this would be of general benefit to parishioners then it would be at no cost to the Council. Cllr M.Howe proposed and Cllr S.Glew seconded that this diversion be applied for. The proposal was approved with 3 votes for, 1 vote against and 2 abstentions.
The dead tree at May Pond Green has been removed
Stuart Kirkham has been asked to remove a dead tree from BR8.
53. REPORTS OF REPRESENTATIVES TO OUTSIDE BODIES
Tewin School The Clerk was asked to find out when the next Governors meeting will be.
Tewin Memorial Hall Nothing to report.
Tewin Website Nothing to report
54. DATE OF NEXT MEETING
The next meeting will be
held on Monday 6th October 2003 at 7.45pm in Tewin Memorial Hall.
As there was no further
business the meeting was closed at 9.30pm.
Fault line:
01438 737321 District Team: 01992 526900 Assistant
District Manager: Val Weaver
Assistant Engineer: Ian Bishop
|
No |
Priority Ref: |
WORK
IDENTIFIED AS NEEDING TO BE DONE AND REPORTED TO THE PARISH ENGINEER. |
DATE WORK
SCHEDULED FOR |
|
1 |
1b |
Bridge
Reflectors in
Churchfield Road White lining & chevrons to be repainted &
reflective discs/paint on bridge |
IB
will contact Steve Minton |
|
2 |
1a |
Flooding
- School Lane
Drainage and reset kerbing nearer edge of the road. |
EHDC
have had budget granted to carry out repair work. |
|
3 |
1c |
Flooding around the Tewin Memorial Hall
School Lane backing up and pushing manhole covers up on path from Car Park to
Hall 12/11Ref 1038106 12/12 chased |
IB will
arrange for a camera to be put down gulleys down Orchard Road and Upper Green
Road |
|
4 |
1d |
Flooding of water in Upper Green Road
opposite entrance to Godfries Close. 12/12 Ref 1042842 |
|
|
5 |
1e |
Flooding on Bramfield Road going to Bulls
Green Gulleys need clearing Ref: 1058851/1058853 2/3/03 |
|
|
6 |
1f |
Flooding in Orchard Road outside No 45.
12/11 Ref 1038104 12/12 chased |
|
|
7 |
1g |
Flooding at Lower Green/Hertford Road where
point is being eroded. |
|
|
|
|
Flooding outside 32 Upper Green Road where
pavement sinking |
|
|
8 |
|
Reinstatment of Verge - The point of Lower Green near
the Post Office is being eroded as cars turn Advice on stopping erosion |
IB will investigate granite edging |
|
9 |
|
Reinstatment of Verge in Orchard Road after road works
Ref 1058848 2.3.03 |
IB will chase Gas Board |
|
10 |
|
Sign - Back of finger Burnham Green
signpost missing on Lower Green. 12/12 Ref 1042844 7/5/03 Ref: 1068407 |
On order |
|
11 |
|
Sign- Tewin Sign at B1000 and Hertford
Road junction broken Ref 1058844 2.3.03 Ref: 1068409 7.5.03 |
On order |
|
|
|
Sign Village Shop sign |
On order |
|
12 |
|
Swallow Hole - opposite 4 Hertford Road
Reported to 24hr Fault line on 1.10.01 Ref 1004796/ 13/5 Ref 1020829 |
IB will chase Water Board |
|
13 |
|
Potholes at the bottom of Tewin Hill Ref:
1068406 7.5.03 |
|
|
|
|
Potholes At Archers Green by pond |
|
|
|
|
Potholes Outside Plume of Feathers by
Post Box |
Done |
|
|
|
Potholes On Churchfield Road |
|
|
14 |
|
Bridge Repair at Tewin Hill past farm
railings on bridge over stream are missing fencing Ref: 1068404 7.5.03 |
|
|
15 |
|
Sign - Disused signs on roadside by
entrance to Church Ref: 1068403
7.5.03 |
|
|
16 |
|
Kerbing - Two Loose Kerbstones on drive
opposite Tewin Stores |
IB will put on works list |
|
17 |
|
Kerbing - Damaged and Missing Kerbing to
be replaced outside the Memorial Hall. |
|
|
|